Online services
for construction and development
Standard electricity supply for a single house | A new electricity supply to a house, or conversion of an existing overhead supply to underground. | Read more | |
Subdividing your land | If you're subdividing your land, you'll need to apply for clearance once you have Western Australian Planning Commission (WAPC) approval. | Read more | |
Standard electricity supply for a multi-residential development | A new electricity supply for a multi-residential development with a maximum demand of 250A/180kVA or less | Read more | |
Non-standard electricity supply for a multi-residential development | A new electricity supply for a multi-residential development with a maximum demand greater than 250A/180kVA. | Read More | |
Small commercial electricity supply | A new electricity supply for a small commercial premise with a maximum demand of 250A/180kVA. | Read More | |
Medium commercial electricity supply | A new electricity supply with a maximum demand greater than 250A/180kVA but no greater than 1300A/1000kVA. | Read More | |
Large commercial connection | You want an electricity supply with a maximum demand greater than 1300A/1000kVA. | Read More | |
Temporary disconnection | For the temporary isolation (disconnection and reconnection) of an existing standard metered supply (a maximum demand of 250A/180kVA or less). | Read More | |
Above standard supply disconnections | You want a permanent or temporary disconnection above a standard supply. | Read More | |
Distribution isolation (LV/HV) | You are doing work that requires part of the Western Power electricity distribution network (0 – 33,000 volts) to be isolated. | Read More | |
Inverter system with capacity up to 10kVA per phase | You're installing an electricity generating system (such as solar panels) that will feed the Western Power network through inverters. | Read More | |
Inverter system greater than 30kVA to 150kVA | You want to connect an embedded generation system (such as solar panels) greater than 30kVA and no more than 150kVA | Read More | |
Remove or relocate a green dome | You need us to remove or relocate a green dome | Read More | |
Remove or relocate a distribution stay pole | You want us to relocate or permanently remove a distribution stay pole | Read More | |
Remove or relocate a low voltage pole | You want us to relocate or permanently remove a low voltage pole. | Read More | |
Remove or relocate a high voltage pole | You want us to relocate or permanently remove high voltage pole. | Read More | |
Remove or relocate a streetlight | You want us to relocate or permanently remove up to 4 streetlights. | Read More | |
Remove or relocate an unmetered supply pit | You want us to or temporarily isolate, relocate, or permanently remove an unmetered supply pit. | Read More | |
Remove or relocate cables | You want us to relocate or permanently remove a distribution cable. | Read More | |
Large scale relocation or removal | You want us to relocate or permanently remove large portions of equipment not covered by smaller services. | Read More | |
Remove or relocate transmission and communication assets | Use this form if you want us to relocate or permanently remove transmission and communication assets. | Read More | |
Upgrade residential electricity supply | You want to increase the current supply to a home. | Read More | |
Non-conventional three phase conversion | You want to modify your connection from single phase up to 3 phases, and where a network connection change is required without increasing your capacity. This application must be completed by a registered electrical contractor. | Read More | |
Three phase conversion | Convert an existing single phase electricity supply to a standard three phase supply. | Read More | |
Upgrade power supply to a small commercial property | You want to upgrade the electricity supply up to a maximum demand of 250A/180kVA. | Read More | |
Upgrade power supply to a medium commercial property | You want to upgrade the electricity supply to a maximum demand greater than 250A/180kva but no greater than 1300A/1000kVA | Read More | |
Install a streetlight | Complete this form to request the installation of standard steel or decorative streetlights. | Read More | |
Install a new unmetered supply up to 20A | Use this service for installation of a new unmetered supply up to 20A. | Read More | |
Direct connection into an existing unmetered supply pillar | Use this form for apply for a direct connection into an existing unmetered supply pillar (red spot fuse). | Read More | |
Modify an unmetered supply | Use this form if you want to isolate, reduce or increase the load, or remove an unmetered supply. | Read More | |
Temporary transmission network isolation | You are doing work that requires part of the Western Power electricity transmission network (33,000-330,000 volts) to be isolated | Read More | |
Design information package | If you're designing a large development (subdivision and/or streetlighting), use this form to request a design information package. | Read More | |
Design conformance review | Use this form to request a design conformance review for customer designed and constructed street lighting or large subdivisions. | Read More | |
Install a single or three phase temporary overhead supply | Install a single or three phase temporary overhead standard supply in an area which is only serviced by overhead supply | Read More | |
Install a temporary supply with above standard power requirements | Install a temporary supply with above standard power requirements. | Read More | |
Meter installation - Above standard supply | You want to install, remove, or relocate metering equipment that is above standard supply. | Read More | |
Technical training and authorisation | Want to build your skills as an electrical contractor? See all our technical training courses on electrical safety and working with Western Power equipment. | Read More | |
Licensing & training | Professionals can find information relating to licensing & training offered by Western Power training services. | Read More | |
Remove or relocate our equipment | Do you need us to move a green dome, streetlight, cables, or other electrical infrastructure? Find out the application process and fees for each type of request here. | Read More | |
Working near transmission and communication assets | Get access to specific network data for your job risk assessment/safe work method statement, or find out what your options are for works within the danger zone. | Read More | |
Overhead to underground conversion | Use this service request if you want to change the existing overhead power supply to an underground installation. | Read More | |
Meter installation and mains connection - standard supply | You want to install one, or multiple, direct meters at a premises that has an existing standard electricity supply, or install a temporary supply in an area with existing underground power. | Read More | |
Inverter system greater than 150kVA to 999kVA | You want to connect an embedded generation system (such as solar panels) greater than 150kVA to 999kVA. | Read More |
Manuals, guides and standards
for construction and development