Shire of Dandaragan
Reliability information
This includes all unplanned interruptions (excludes planned interruptions and interruptions lasting one minute or less). The reliability data includes delays to restoration due to bushfire settings.
25 hours & 58 minutes
average time without power in 2022/2023 per customer
10 interruptions
on average per customer in 2022/2023
Scheduled work in 2023/2024
Maintenance on:
- 29 poles and associated equipment
- 6 distribution earthings
- 2 groundmounted switchgear
- 25 overhead switchgear
- 1 reinforce metal pole
- 163 reinforce wood poles
- 1 street light
Replacement of:
- 5 drop out fuses
- 7 insulators
- 25 overhead switchgear
- 14 stay wires and stay insulators
- 163 wood poles
- 2 metal poles
- 1 surge arrestor
- 35 distribution pole cross arms
- 2 sectionalisers
- 1 pole top switch
Installation of:
- 10 LV spreaders