Skip to content

Online Services

Register business as sensitive customer

Commercial or industrial customers can apply to become a ‘sensitive customer’ if there is a high risk that an extended power outage could result in adverse economic, health, environmental or public safety consequences.

Application for clearance

If you're subdividing your land, you'll need to apply for clearance once you have Western Australian Planning Commission (WAPC) approval.

Large commercial electricity supply

You want an electricity supply with a maximum demand greater than 1300A/1000kVA.

Temporary distribution network isolation

You are doing work that requires part of the Western Power electricity distribution network (0 – 33,000 volts) to be isolated.

Remove or relocate a green dome

You need us to remove or relocate a green dome

Remove or relocate a distribution stay pole

You want us to relocate or permanently remove a distribution stay pole

Remove or relocate a low voltage pole

You want us to relocate or permanently remove a low voltage pole.

Remove or relocate a high voltage pole

You want us to relocate or permanently remove high voltage pole.

Remove or relocate a streetlight

You want us to relocate or permanently remove up to 4 streetlights.

Remove or relocate an unmetered supply pit

You want us to or temporarily isolate, relocate, or permanently remove an unmetered supply pit.

Remove or relocate cables

You want us to relocate or permanently remove a distribution cable.

Large scale relocation or removal

You want us to relocate or permanently remove large portions of equipment not covered by smaller services.

Increase residential electricity supply

You want to increase the current supply to a home.

Non-conventional three phase conversion

You want to modify your connection from single phase up to 3 phases, and where a network connection change is required without increasing your capacity.

Three phase conversion

Convert an existing single phase electricity supply to a standard three phase supply.

Upgrade power supply to a small commercial property

You want to upgrade the electricity supply up to a maximum demand of 250A/180kVA

Upgrade power supply to a medium commercial property

You want to upgrade the electricity supply to a maximum demand greater than 250A/180kva but no greater than 1300A/1000kVA

Install a streetlight

Complete this form to request the installation of standard steel or decorative streetlights.

Install a new unmetered supply up to 20A

Use this service for installation of a new unmetered supply up to 20A.

Direct connection into an existing unmetered supply pillar

Use this form for apply for a direct connection into an existing unmetered supply pillar (red spot fuse).

Modify an unmetered supply

Use this form if you want to isolate, reduce or increase the load, or remove an unmetered supply.

Temporary transmission network isolation

You are doing work that requires part of the Western Power electricity transmission network (33,000-330,000 volts) to be isolated

Design information package

If you're designing a large development (subdivision and/or streetlighting), use this form to request a design information package.

Design conformance review

Use this form to request a design conformance review for customer designed and constructed street lighting or large subdivisions.

Remove or relocate our equipment

There are many reasons why our infrastructure may need to be removed or relocated. Whatever the reason this is the page to help get the process underway.

Transmission loads and large generators

For all transmission load connections and generator connections in excess of 150 kVA.

Working near transmission and communication assets

We can provide specific network data that may be useful for your job risk assessment/safe work method statement.