Skip to content

Online Services

Standard electricity supply for a single house

A new electricity supply to a house, or conversion of an existing overhead supply to underground.

Application for clearance

If you're subdividing your land, you'll need to apply for clearance once you have Western Australian Planning Commission (WAPC) approval.

Standard electricity supply for a multi-residential development

A new electricity supply for a multi-residential development with a maximum demand of 250A/180kVA or less

Non-standard electricity supply for a multi-residential development

A new electricity supply for a multi-residential development with a maximum demand greater than 250A/180kVA.

Small commercial electricity supply

A new electricity supply for a small commercial premise with a maximum demand of 250A/180kVA.

Medium commercial electricity supply

A new electricity supply with a maximum demand greater than 250A/180kVA but no greater than 1300A/1000kVA.

Large commercial electricity supply

You want an electricity supply with a maximum demand greater than 1300A/1000kVA.

Termination of consumer mains

Termination of a consumer mains greater than 35mm.

Temporary disconnection

You're doing work that requires part of the Western Power electricity network to be isolated.

Above standard supply disconnections

You want a temporary or permanent disconnections above a standard supply.

Temporary distribution network isolation

You are doing work that requires part of the Western Power electricity distribution network (0 – 33,000 volts) to be isolated.

Inverter system with capacity to 10kVA per phase

You're installing an electricity generating system (such as solar panels) that will feed the Western Power network through inverters.

Inverter system greater than 30kVA and no more than 150kVA

You want to connect an embedded generation system (such as solar panels) greater than 30kVA and no more than 150kVA

Remove or relocate a green dome

You need us to remove or relocate a green dome

Remove or relocate a distribution stay pole

You want us to relocate or permanently remove a distribution stay pole

Remove or relocate a low voltage pole

You want us to relocate or permanently remove a low voltage pole.

Remove or relocate a high voltage pole

You want us to relocate or permanently remove high voltage pole.

Remove or relocate a streetlight

You want us to relocate or permanently remove up to 4 streetlights.

Remove or relocate an unmetered supply pit

You want us to or temporarily isolate, relocate, or permanently remove an unmetered supply pit.

Remove or relocate cables

You want us to relocate or permanently remove a distribution cable.

Large scale relocation or removal

You want us to relocate or permanently remove large portions of equipment not covered by smaller services.

Remove or relocate transmission and communication assets

Use this form if you want us to relocate or permanently remove transmission and communication assets.

Increase residential electricity supply

You want to increase the current supply to a home.

Non-conventional three phase conversion

You want to modify your connection from single phase up to 3 phases, and where a network connection change is required without increasing your capacity.

Upgrade power supply to a small commercial property

You want to upgrade the electricity supply up to a maximum demand of 250A/180kVA

Upgrade power supply to a medium commercial property

You want to upgrade the electricity supply to a maximum demand greater than 250A/180kva but no greater than 1300A/1000kVA

Install a streetlight

Complete this form to request the installation of standard steel or decorative streetlights.

Install a new unmetered supply up to 20A

Use this service for installation of a new unmetered supply up to 20A.

Direct connection into an existing unmetered supply pillar

Use this form for apply for a direct connection into an existing unmetered supply pillar (red spot fuse).

Modify an unmetered supply

Use this form if you want to isolate, reduce or increase the load, or remove an unmetered supply.

Temporary transmission network isolation

You are doing work that requires part of the Western Power electricity transmission network (33,000-330,000 volts) to be isolated

Design information package

If you're designing a large development (subdivision and/or streetlighting), use this form to request a design information package.

Design conformance review

Use this form to request a design conformance review for customer designed and constructed street lighting or large subdivisions.

Install a single or three phase temporary overhead supply

Install a single or three phase temporary overhead standard supply in an area which is only serviced by overhead supply

Install a temporary supply with above standard power requirements

Install a temporary supply with above standard power requirements.

Meter installation - Above standard supply

Use this form if you want to install, remove or relocate metering equipment that is above standard supply.

Technical training and authorisation

We offer a range of technical training through our registered training organisation, Power Training Services WA, located in Jandakot, WA.

Licensing & training

Professionals can find information relating to licensing & training offered by Western Power training services.

Remove or relocate our equipment

There are many reasons why our infrastructure may need to be removed or relocated. Whatever the reason this is the page to help get the process underway.

Working near transmission and communication assets

We can provide specific network data that may be useful for your job risk assessment/safe work method statement.

Overhead to underground conversion

Use this service request if you want to change the existing overhead power supply to an underground installation.

Meter installation and mains connection - standard supply

Use this service request if you want to install one, or multiple, direct meters at a premise that has an existing standard electricity supply or Install temporary supply in an area with existing underground power.

Inverter system greater than 150kVA and less than 1MVA

You want to connect an embedded generation system (such as solar panels) greater than 150kVA and less than 1MVA.

Three phase conversion

Convert an existing single phase electricity supply to a standard three phase supply.