Skip to content

Online Services

Termination of consumer mains

Termination of a consumer mains greater than 35mm.

Temporary disconnection

You're doing work that requires part of the Western Power electricity network to be isolated.

Above standard supply disconnections

You want a temporary or permanent disconnections above a standard supply.

Temporary distribution network isolation

You are doing work that requires part of the Western Power electricity distribution network (0 – 33,000 volts) to be isolated.

Non-conventional three phase conversion

You want to modify your connection from single phase up to 3 phases, and where a network connection change is required without increasing your capacity.

Three phase conversion

Convert an existing single phase electricity supply to a standard three phase supply.

Upgrade power supply to a small commercial property

You want to upgrade the electricity supply up to a maximum demand of 250A/180kVA

Upgrade power supply to a medium commercial property

You want to upgrade the electricity supply to a maximum demand greater than 250A/180kva but no greater than 1300A/1000kVA

Upgrade power supply to a large commercial property

You want to upgrade the electricity supply to a maximum demand greater than 1300A/1000kVA.

Direct connection into an existing unmetered supply pillar

Use this form for apply for a direct connection into an existing unmetered supply pillar (red spot fuse).

Temporary transmission network isolation

You are doing work that requires part of the Western Power electricity transmission network (33,000-330,000 volts) to be isolated

Overhead to underground conversion

Use this service request if you want to change the existing overhead power supply to an underground installation.