Skip to content

Connection schemes

Service Apparatus Connection Scheme (SACS)

Western Power’s Service Apparatus Connection Scheme (SACS) permits accredited electrical contractors via their authorised workers to connect kWh meters and terminate into an energised underground pillar. The installation must however be left de-energised. The scheme is limited to the connection of single direct wired metering installations not exceeding 100 amperes and includes distributed master metering.

Contractor Connect Scheme

The Contractor Connect Scheme (CCS) permits accredited electrical contractors, via their authorised electrical workers, to connect new installations to Western Power’s electricity distribution network. Following satisfactory testing and checking of the electrical installing work the contractor may leave the installation energised.

Was this page helpful?YesNo

How can we improve this page

We'd love to hear what you didn't like or how we can improve this page.

Thanks for the feedback

Thanks for the feedback

We're always trying to find ways to improve our customer service.