Small commercial electricity supply

Small commercial electricity supply

Approximate time required to complete application: 10 minutes.

Apply here

Apply for this connection if you want an electricity supply with a maximum demand of 250A/180kVA.

How long will it take?

  • 3 weeks to provide you with a quote
  • 10 weeks to build once payment is received and customer has confirmed with Western Power the site is ready for construction

What will I need to complete this application?

  • CAD plan
  • Site photos
  • Single line diagram
  • Load breakdown
  • Disturbing loads
  • Statement of Compliance to AS61000.3.6
  • Neighbours authority

How much will it cost?

We will provide you with a quote.

What more do I need to know?

We will normally service new connections of this nature with a pillar. The pillar location will need to meet clearance requirements.

Substation site

  • Depending on your supply requirements you may need to provide space for a substation site. We will notify you if this is the case. If you are readily able to provide a substation site, your project will continue. If you cannot, then a feasibility study will gain you access to one of our consultant engineers to assist you in finding a solution.
  • When you’re considering your substation site, please read the Western Power Distribution Substation Manual. If you would like to apply for a non-compliant site it will need to be approved. You can do this in consultation with our consultant engineers via a  feasibility study.
  • The final specifications for the substation requirements will be determined when our engineers create your design. This means that the substation site you provide may be subject to change.
  • We will install the substation as part of the construction works; however you will need to prepare the site in advance. Some assistance in this can be found in the Western Australian Distribution Connection Manual.
  • If your supply will be greater than 100A your electrical contractor will provide the appropriate sized current transformers.
  • Your electrical contractor will need to complete the installation of direct metering.
  • We will be responsible for terminating the consumer mains into the pillar, kiosk or transformer.
  • If your property will have multiple points of supply, check the compliance information from the West Australian Electrical Requirements. In some cases non-compliant points of supply might still be viable - if you would like to pursue this, consider a feasibility study.

 

Fees and charges

Following the cancellation, expiry, termination or variation of the Customer Work Request or any other aspect of the works or documentation relating to the works, the customer may be liable to pay an administration fee of $550 (inclusive of GST) and any additional costs incurred by Western Power. Further information can be found in our Terms and Conditions clauses 8 and 16.3.

Small commercial electricity supply

Approximate time required to complete application: 10 minutes.

Apply here