Meter installation - Above standard supply

Meter installation - Above standard supply

Approximate time required to complete application: 10 minutes

Apply here

Use this form if you want to install, remove or relocate metering equipment that is above standard supply. 

How long will it take?

  • 3 weeks to provide you with a quote
  • 10 weeks for construction

How much will it cost?

We will provide you with a quote, as the new power meter price can vary based on meter type.  

What will I need to complete this application?

What if I change my mind or want to cancel my application?

Sometimes your circumstances change and you may need to cancel or change the information within your application after you have submitted it to us.

If you wish to change the scope of work in your application we will first review the change and then either:

  • continue the project with the variation and invoice you for any additional materials, design work and remobilisation costs incurred. We will typically only take this approach when the change is very minor.

or

  • if the change is significant we will cancel your project. You will need to submit a new application with your new requirements.

For cancelled applications we will invoice you for the costs incurred up to the point of cancellation (time and materials). If construction work has already commenced we will refund the difference from your access offer less any costs incurred.

Information for authorised electrical contractors only - Apply for a new meter installation

  • Metropolitan

    Please download and complete the meter request notice - metropolitan and present to your local distribution outlet to collect your meter/s.

  • Regional

    In regional areas with no distribution outlet, please complete and fax the meter request notice - non metropolitan to Western Power meter services on (08) 9225 2654 and we will arrange delivery of the meter/s to you. 

  • Distribution outlets

    Please download and complete the meter order form to place orders for additional metering stock.

Once you’ve received confirmation of your Western Power meter upgrade or change, your meter/s can be collected in person from one of the distribution outlets below.

Metro Phone No
Blackwoods
204 Bannister Rd, Canning Vale 9311 6500
53 Office Rd, Kwinana 9439 1799
819 Marshall Rd, Malaga 9208 7300
48 Reserve St, Mandurah 9582 0733
Myelec
U1/50 Discovery Drive, Bibra Lake  9331 7575
U1/16 Fortitude Blvd, Gnangara  9302 6450
29 Farrall Road, Midvale 9250 3040
2 Colin Jamieson Drv, Welshpool 9458 6788

 

Regional Phone No
Blackwoods
194 Albany Hwy, Albany 6820 2000
11 Clifford St, Bunbury 9725 5300
115 Flores Rd, Geraldton 9921 1533
11 Wilurarra Rd, West Kalgoorlie 9026 4000
Electrical Distributors
15 Trumper Drive, Busselton 9754 1911
U2/40 Station Rd, Margaret River 9758 8011

Meter installation - Above standard supply

Approximate time required to complete application: 10 minutes

Apply here